Development History

Development History

2015.5

Jiangsu Hengshen Co., Ltd. was successfully listed on the New Three Board in Beijing.

2015.1

Jiangsu HS fibre material Co., Ltd. was officially renamed as Jiangsu Hengshen Co., Ltd.

2014.5

The daily output of the preimpregnation workshop exceeded 10000m2 for the first time.

2014.3

The plant of raw silk line 5 has been completed.

2014.2

Through the technical appraisal of China electric power association, HS became the first company to pass the F2B (highest grade).

2014.1

HF40-12K carbon fibre has been successfully developed.

2013.7

Zoomlion’s 101-meter (the highest in the world) cement pump truck made its debut in Wuhan. The oil cylinder made of the carbon fibre composite materials of the pump truck was developed by our company.

2013.6

HF40-6K carbon fibre was successfully developed.

2012.9

The products were recognized by foreign enterprises, and the company began to receive international orders.

2012.7

Former premier -Wen Jiabao visited HS

2012.6

Prepreg 3# line one-step equipment was debugged successfully, and the first volume of heavy weight prepreg was produced.

2012.4

Braiding workshop achieved full-load production and implemented four shifts and three operations within 24 hours.

Construction of the new material center was started.

2011.11

High temperature curing epoxy resin prepreg was successfully produced.

2011.10

Xu Qiliang, vice chairman of central military commission, and Luo Zhijun, secretary of Jiangsu provincial party committee, inspected HS.

2011.9.

HS made its debut on the Shanghai Composites Exhibition and its name was first noticed by people.

2011.8

HF30-3K carbon fibre was successfully developed.

2011.7

HF10-12K carbon fibre was successfully developed.

2011.2

Carbon fibre composite cable core was successfully developed.

2011.1

The head cover of the high-speed train was accepted.

Li xueyong, Jiangsu governor, inspected HS.

2010.11

The prepreg was produced continuously for the first time for 5000m.

2010.8

Prepreg 1# line was successfully debugged and the first volume of qualified prepreg was produced.

The first batch of carbon fibre was tested by the national quality supervision and inspection center and reached the T300 level.

2010.7

Carbonized phase I operated successfully.

Spinning line operated successfully.

Polymerizer operated.

2009.3

The commencement ceremony of the main plant construction.

2008.2

Foundation laying ceremony for administration building.

2007.8

Jiangsu HS fibre materials Co., Ltd. was registered and founded.